Home > 사업분야 > 항공기조립

항공기조립

  • Complicate component assy

    T50, F/A50 Center Fuselage

    T50, F/A50 Center Fuselage
    • Seal bonding for fuel tank area(Special Process; FMS-3014 FORM Ⅰ/Ⅱ)
    • Various of type Angle Drill Gun (Inaccessible area)
    • Micro Peck Feed Drill(1.20” Thick)
    • Installation, Squeezing
    • KAI’s 1ST Major Assembly offload of T50
  • Aerodynamic structure assy

    B737 Max & P-8A Vertical Fin, Horizontal Stabilizer

    B737 Max & P-8A Vertical Fin, Horizontal Stabilizer
    • KC control of aerodynamic feature
    • Countersinking on thin skin
    • Cold Working Special Process
    • De-Icing Test
    • Handling of Alclad Skin
  • Sub assy of control surface

    B777 Fixed Leading Edge Ribs

    B777 Fixed Leading Edge Ribs
    • Installation bush with shrink fit
    • Precise tolerance of bush In-Dia
    • Bolting – Torque control
    • Faring – Hole alignment
    • KC value of Gap between Ribs
    • Top coating painting process
  • Retrofit panel assy

    A320 Wing Retrofit Panel Assy

    A320 Wing Retrofit Panel Assy
    • Turnkey Base Project From Material to Shipping
    • Peen formed skin for contour control
    • Fastener Head flushness to Aerodynamic
    • Interchange by control manhole assy
Back to Top